TY - JOUR ID - epos1473 UR - http://dx.doi.org/10.1016/S0013-7952(02)00039-X IS - 3-4 A1 - Castanos, Heriberta A1 - Lomnitz, Cinna N2 - Probabilistic seismic hazard analysis (PSHA) is beginning to be seen as unreliable. The problem with PSHA is that its data are inadequate and its logic is defective. Much more eliable, and more scientific, are deterministic procedures, especially when coupled with engineering judgment. VL - 66 TI - PSHA: is it science? AV - none EP - 317 Y1 - 2002/11// PB - Elsevier Science JF - Engineering Geology KW - Probabilistic seismic hazard analysis; Deterministic seismic hazard analysis; Earthquakes SN - 0013-7952 SP - 315 ER -